archimedes
write

EverythingResilience & Technical Communication

Sheet 03 — Resilience & Technical Communication

The materials a room can actually follow

A flood, watershed, or energy project often has to explain itself to people who will not open a geodatabase. The work is the wrap: narrative, accessibility, evidence, and a handoff the next person can pick up.

  • GISTeammate
  • WrapASG
  • Steps4
  • SealNone

Title blockASG-03

Sheet
03 of 04
Discipline
Narrative / maps
Output
StoryMap, packet, turnover
Runs
To the NTE
Ends in
A meeting that lands

Gate. GIS via a named teammate; ASG wraps scope, narrative, accessibility, and docs. Not hydrology, not a PE seal, not EPC.

The opinion behind it

A map that cannot be read, or a story nobody can pick up after you leave, is not communication. The wrap is the product; the seal is not ours to give.

Same method as the rest of the firm: Understand → map → improve → evidence and a handoff.

Source, wrap, StoryMap — GIS via teammateFig. ASG-03
Source, wrap, StoryMap — GIS via teammateFour stacked cards, top to bottom. What you already have comes in first — notes, existing maps, the file cabinet. ASG wraps scope, narrative, accessibility, and the document pack; GIS production, when the drawing itself is the work, is a named teammate and stops at that wrap. What a room can use is a StoryMap or insert set, a stakeholder packet, and turnover notes. The last card is the handoff: you keep the file. Nothing on this sheet is a hydrology model, a PE seal, or an EPC package.FOUR CARDS — THE WRAP IS THE PRODUCT01What you already haveNOTES · EXISTING MAPS · THE FILE CABINET02The wrapSCOPE · NARRATIVE · A11Y · DOCS — GIS VIA TEAMMATE03What a room can useSTORYMAP OR INSERTS · STAKEHOLDER PACKET · TURNOVER NOTES04HandoffYOU KEEP THE FILE. NOT HYDROLOGY, NOT A PE SEAL, NOT EPC.THE SEAL IS NOT OURS TO GIVE.
  1. What you already haveNotes, existing maps, the file cabinet.
  2. The wrapScope, narrative, accessibility, docs. GIS via teammate when the drawing is the work.
  3. What a room can useStoryMap or inserts, stakeholder packet, turnover notes.
  4. HandoffYou keep the file. Not hydrology, not a PE seal, not EPC.

Four stacked cards, top to bottom. What you already have comes in first — notes, existing maps, the file cabinet. ASG wraps scope, narrative, accessibility, and the document pack; GIS production, when the drawing itself is the work, is a named teammate and stops at that wrap. What a room can use is a StoryMap or insert set, a stakeholder packet, and turnover notes. The last card is the handoff: you keep the file. Nothing on this sheet is a hydrology model, a PE seal, or an EPC package.

Named outcomes4 things you keep

  • A one-topic StoryMap, scoped and accessible
  • A multi-map or hazard set with a not-to-exceed
  • Stakeholder evidence a meeting can stand on
  • Turnover docs the next person can actually use

Named consultingin resilience & technical communication

Named startersResilience starters — scope still agreed in writingthe scope sheet

  • One-topic StoryMap

    $4,000–$8,000 NTE

    One topic, narrative and accessibility wrap. GIS via teammate.

  • Multi-map / hazard set

    $8,000–$15,000 NTE

    A set, not a program. Not hydrology, not a PE seal.

What this covers7 areas, and where each one bites

  • One-topic StoryMapOne topic, narrative and accessibility wrap, a not-to-exceed. The meeting is the product.
  • Multi-map / hazard setA named set, not a program. Bounded by the NTE. Same wrap, more frames.
  • Stakeholder evidenceThe packet a meeting can stand on, sourced, with the gaps named rather than filled in.
  • Turnover documentsWhat it is, where it lives, what not to break, who owns it next. Usable, not ceremonial.
  • Bid / no-bid advisoryGovcon capture as method, not a fourth practice: read the solicitation, decide honestly, write to the criteria. A no-bid is a deliverable. No invented past performance.
  • GIS via teammateProduction drawing when the map itself is the work. ASG does not claim a live GIS factory.
  • The wrapScope, narrative, accessibility, docs. That is the ASG product on this sheet.

GIS production via a named teammate; ASG wraps scope, narrative, accessibility, and docs. Not hydrology, not a PE seal, not EPC.

What holds this workstandards we know, not certifications we hold

  • Named topicOne StoryMap or a named hazard set, with a not-to-exceed. Not a standing GIS program.Every map engagement
  • WCAG wrapThe narrative and the document pack have to be usable. The map does not get a pass because it is a map.The wrap
  • Sourced packetStakeholder evidence is assembled from what you have. Gaps are named. Analysis is not invented.Meetings
  • TurnoverThe next person can pick it up. File map, what not to break, named owner.After the meeting

Where it stopsan empty row is work this firm does not take

One-topic StoryMap
One-topic StoryMap — Wrapped: yes
One-topic StoryMap — Accessible: yes
One-topic StoryMap — Handed over: yes
Multi-map / hazard set
Multi-map / hazard set — Wrapped: yes
Multi-map / hazard set — Accessible: yes
Multi-map / hazard set — Handed over: yes
Stakeholder packet
Stakeholder packet — Wrapped: yes
Stakeholder packet — Accessible: yes
Stakeholder packet — Handed over: yes
Turnover notes
Turnover notes — Wrapped: yes
Turnover notes — Accessible: no
Turnover notes — Handed over: yes
Hydrology / PE seal
Hydrology / PE seal — Wrapped: no
Hydrology / PE seal — Accessible: no
Hydrology / PE seal — Handed over: no
EPC or electrical design prime
EPC or electrical design prime — Wrapped: no
EPC or electrical design prime — Accessible: no
EPC or electrical design prime — Handed over: no

How those outcomes get hired

You hire the wrap around a named topic or hazard set: narrative, accessibility, a meeting packet, and turnover — not a hydrology model and not a PE seal.

Capacity

ASG is the wrap: scope, narrative, accessibility, docs. GIS production, when it is the drawing itself, is a named teammate. That split is written down before work starts.

A not-to-exceed is the capacity line. If the set wants to become a program, that is a different conversation, and often a no.

Start a conversationStraight answer, no deck. What it takes to start.

One standard, more than one practicewhy these are three sheets and not three firms

  • Section 508Section 508 — Accessible Public Systems: we write toSection 508 — Operational Systems & Quality: does not applySection 508 — Resilience & Technical Communication: we write to
  • ADA Title IIADA Title II — Accessible Public Systems: we write toADA Title II — Operational Systems & Quality: does not applyADA Title II — Resilience & Technical Communication: does not apply
  • WCAG 2.1 AAWCAG 2.1 AA — Accessible Public Systems: we write toWCAG 2.1 AA — Operational Systems & Quality: does not applyWCAG 2.1 AA — Resilience & Technical Communication: we write to
  • ISO 9001ISO 9001 — Accessible Public Systems: does not applyISO 9001 — Operational Systems & Quality: we write toISO 9001 — Resilience & Technical Communication: does not apply
  • NQA-1 / App BNQA-1 / App B — Accessible Public Systems: does not applyNQA-1 / App B — Operational Systems & Quality: we write toNQA-1 / App B — Resilience & Technical Communication: does not apply
  • CMMC Level 2CMMC Level 2 — Accessible Public Systems: does not applyCMMC Level 2 — Operational Systems & Quality: we write toCMMC Level 2 — Resilience & Technical Communication: does not apply
  • Human sign-offHuman sign-off — Accessible Public Systems: we write toHuman sign-off — Operational Systems & Quality: we write toHuman sign-off — Resilience & Technical Communication: we write to

Human sign-offThe line that crosses all three. Models may draft; a person decides and signs; the record says who. None of the others survive without it.